Groundworks RAMS for UK Sites
Groundworks RAMS turn on what is under the ground and what is moving above it: buried services, excavation support, plant and pedestrian separation, and the permit arrangements that control digging. This page explains what a groundworks Risk Assessment and Method Statement usually needs to address, then you can build yours free in the QR Safety RAMS Builder.
Create your free RAMSTypical activities to cover
- Site set-up, fencing, welfare siting and establishing haul routes.
- Service searches, drawings review, scanning and hand digging trial holes.
- Site clearance, strip and reduce dig, muck away.
- Excavating foundations, pits, trenches and attenuation features.
- Excavation support, battering, shoring or trench boxes as designed.
- Drainage runs, chambers, connections and testing.
- Concrete pours, reinforcement placing and pumping.
- Kerbing, sub-base, surfacing and reinstatement.
- Backfill, compaction and final level checks.
Hazards and planning considerations
- Striking buried services — electricity, gas, water, telecoms and fibre.
- Collapse of excavation sides and undermining of nearby structures.
- People and plant falling into open excavations.
- Plant and pedestrian interface, reversing, blind spots and banksman arrangements.
- Overturning plant on soft ground, slopes or close to the edge of an excavation.
- Water ingress, flooding and the need for pumping or dewatering.
- Buried contamination, made ground, dust, fumes and hazardous ground gases.
- Confined space conditions in deep excavations and chambers.
- Wet concrete contact, cement burns and pumping pressures.
- Noise, vibration and hand-arm vibration from breakers and compaction plant.
- Permit to dig and other authorisations, which the builder requires you to confirm.
- Neighbouring property, highways, public rights of way and traffic management.
Site-specific information you need to provide
- Site address, boundaries, ground conditions and any known contamination.
- Service drawings, search results and who carried out the scanning.
- Permit to dig arrangements and who issues and signs them.
- Excavation depths, dimensions and the support or battering design being followed.
- Plant being used, operator competence and the haul and pedestrian routes.
- Traffic management and arrangements for the public and site neighbours.
- How spoil and waste are stored and removed.
- Welfare, first aid and emergency arrangements, including the nearest A&E.
- Supervision arrangements and who stops work if conditions change.
Illustrative outline sequence
Illustrative only. This is not a complete safe system of work. It must be adapted to your actual job, site and team, and reviewed and approved by a competent person before any work starts.
- Induction, service information reviewed, permit to dig issued before any breaking ground.
- Area set out, segregated, and plant and pedestrian routes established.
- Services scanned and confirmed by careful hand dig trial holes.
- Excavation carried out to the planned dimensions with support or battering as designed.
- Excavation protected with barriers and inspected before entry and after any change.
- Drainage or foundation works installed, tested and signed off.
- Backfill and compaction completed, levels checked, area reinstated and cleared.
How the builder helps
- Select the groundworks, excavation, plant and traffic activity groups to bring in the recommended controls and risk ratings.
- The builder prompts you to confirm permit-to-dig arrangements where ground is being broken.
- Add custom hazards for the specific ground conditions and surroundings.
- Record COSHH items such as cement, fuels and sealants with data sheets attached.
- Write the sequence of works yourself, dictate it, or edit an AI first draft.
- Add emergency arrangements and the nearest A&E, then export a branded PDF or Word document.
Not sure where to start? Read the step-by-step guide or draft a RAMS with AI from a short job brief.