Roofing RAMS for UK Sites
Roofing RAMS live or die on the access and fall-protection detail: how people and materials get onto the roof, what stops a fall from the edge or through the surface, and what happens when the weather turns. This page sets out what a roofing Risk Assessment and Method Statement usually needs to address before you build yours free in the QR Safety RAMS Builder.
Create your free RAMSTypical activities to cover
- Setting up access — scaffold, stair tower, ladder access, MEWP or roof hatch.
- Installing edge protection, guardrails, netting, crawl boards or covers.
- Stripping existing coverings, battens, felt, tiles, slates or sheets.
- Loading out and distributing materials across the roof.
- Flat roofing works including single ply, built-up felt and liquid systems.
- Hot works such as torch-on felt or bitumen boilers, where used.
- Pitched roof tiling, slating, leadwork, flashings and verge details.
- Gutter, valley, rooflight and penetration detailing.
- Waste removal, clearing down and final inspection.
Hazards and planning considerations
- Falls from the roof edge, through openings, and through fragile or corroded surfaces.
- Falling materials, tools and debris reaching people below.
- Weather — wind on sheets and membranes, rain, ice, heat and sun exposure.
- Access equipment: scaffold handover, inspection records and safe loading limits.
- Fire risk where hot works are used, including hidden voids and adjacent materials.
- Manual handling of tiles, sheets, rolls, lead and waste.
- Asbestos risk in older roofs and the need to check records before disturbance.
- Public, occupants and other trades below the work area.
- Fumes, dust and hazardous substances from primers, adhesives and sealants.
- Rescue arrangements if someone falls into a harness or is injured on the roof.
Site-specific information you need to provide
- Roof type, pitch, construction, condition and any fragile areas or rooflights.
- How the roof is accessed and who provides and inspects the access equipment.
- Scaffold or edge protection arrangements, handover certificates and inspection intervals.
- The exclusion zone below, and how the public and occupants are kept out of it.
- Asbestos survey or management information for the building.
- How materials are lifted and where they are stored and loaded out.
- Permit requirements, including any hot works permit from the client.
- Working hours, weather limits and who decides to stop work.
- First aid, rescue and emergency arrangements, including the nearest A&E.
Illustrative outline sequence
Illustrative only. This is not a complete safe system of work. It must be adapted to your actual job, site and team, and reviewed and approved by a competent person before any work starts.
- Induction, permits in place, roof condition and asbestos information confirmed.
- Access and edge protection installed, inspected and handed over before use.
- Exclusion zone set out below with signage and barriers.
- Existing covering stripped in planned bays, waste cleared as you go.
- Materials loaded out within the agreed loading limits.
- New covering, flashings and details installed in sequence.
- Work inspected, area cleared, access and protection removed in a controlled order.
How the builder helps
- Select the roofing, work-at-height and access activity groups to pull in the recommended controls and risk ratings.
- Add custom hazards for the specific roof, building and surroundings.
- Record COSHH items such as primers, adhesives and cleaners with data sheets attached.
- Complete manual handling assessments for tiles, rolls, sheets and waste.
- Write the sequence of works yourself, dictate it, or edit an AI first draft.
- Add emergency arrangements and the nearest A&E, then export a branded PDF or Word document.
Not sure where to start? Read the step-by-step guide or draft a RAMS with AI from a short job brief.